Installation Instructions
Step 1: Prepare the Installation Area
1. Measure and mark your starting height.
2. Install your first Shelf Support
Step 2: Position the Jig
1. Place the Elevated Cellar Front Shelf Support Installation Jig between the Rod runs and on the top of the Shelf Support already install.
2. Align the jig with the Bubble Level.
3. Confirm the jig is perfectly level before proceeding.
The jig automatically positions the Shelf Support components with correct spacing and symmetry across the Rods.
Step 3: Install the Front Shelf Support Components
1. Insert the Front Shelf Support components into the designated alignment points on the jig.
2. Ensure Shelf Supports are properly oriented.
3. Secure the components to the Rod mounts according to system specifications.
4. Tighten all required fasteners firmly.
Step 4: Verify Alignment
1. Check that both sides are symmetrical.
2. Confirm Shelf Supports are level and evenly spaced.
3. Make any minor adjustments before fully tightening.
Step 5: Repeat for Additional Rows
1. Reposition the jig to the next desired height.
2. Use previously installed Shelf Supports as visual reference.
3. Repeat installation steps to maintain consistent spacing throughout the project.
- Best Practices
- Always confirm level before tightening fasteners.
- Work row-by-row for optimal consistency.
- Periodically step back to visually inspect alignment.
- Maintain even Rod tension during installation. - Results
- Using the Elevated Cellar Front Shelf Support Installation Jig ensures:
- Perfect symmetry across Rod mounts
- Faster, more efficient installations
- Reduced labor costs
- Clean, professional wine cellar displays
For best results, use this jig exclusively with Elevated Cellar Rod-to-Rod Front Shelf Support systems and follow all system-specific installation guidelines.